Building I/J at the Parks will be known as the Hartley. One of several new buildings to go into the redeveloped campus owned by Hines. The Hartley is a six story, 323-unit apartment building located in North Washington D.C. The dwelling units have a 16 SEER Carrier INFINITY series heat pump split system that conditions the space. All lower floor and supply duct work is insulated with insulation. Amenity areas are conditioned with ducted 16 SEER Carrier split systems as well as the common areas. There are 3 DOAS rooftop units and outside air risers throughout the building. Additional equipment installed by Titan, exhaust fans, heaters, motorized dampers and controls. CO2/NO2 sensors and control panel located in the garage as well as circulation fans.
South Alex is a 400 Unit wood frame apartment building with a precast garage. Dwelling and amenity area consist of Carrier 15 SEER heat pump split systems. OA and exhaust ducted at the exterior of the building. Daikin ductless split systems for back of house and Carrier RTU’s for the elevators. All corridors are conditioned by a 15 SEER heat pump with OA risers. SSA is the mechanical engineer of record.
Titan Mechanical has been awarded the Mechanical Design Build contract for the Park Center project located at 395 & Rt. 7 in Alexandria, Virginia. The project will consist of 2 existing buildings renovated from office to multifamily. Over the past 8 months, Titan has been working through the design challenges for this conversion with Whiting Turner’s elite management team. This project will provide 460+ dwellings with amenities and garage to Northern Virginia’s residents. Construction will begin in June. Titan Mechanical’s Senior Project Manager Carla Villena has been at the helm providing value and leadership towards this exciting and difficult product. It has been a pleasure to work with both Lowe and Whiting Turner on this venture.
The Oxford transforms a former office building into 187 luxury apartment homes. The amenities include a fitness center, cyber cafe, pet care facility, lounge, courtyard, dog park, and entertainment room on the tenth floor. 14 SEER Heat Pump system for Amenities and Dwellings. DOAS with Energy Wheel serving OA and recycling all exhausts from TE and KE risers.
Loudoun Station is a 6-story building that holds 317 dwelling units that are broken into two separate buildings. It has a gym with a basketball court and also a dog washing station. Titan Mechanical furnished and installed all ductwork and equipment to condition all space. Loudoun station has multi-zone split system heat pumps located in the in the gym and basement area. Ductless split systems serve the elevator control rooms. Dwelling units are conditioned by Carrier split system heat pump systems. Building E has three AAON packaged rooftop units to supply the corridors and gym and building F has one. Exhaust risers throughout both buildings for garage, trash room, elevator and electric rooms for exhaust with the fan located on the roof. Titan mechanical has also furnished and installed all CO2 sensors and equipment to ensure proper exhaust of the garage.
East Capital is a four-story partial brick building located at 3534 East Capital St Washington Dc with 137 dwelling units. This building also boasts a gym and other common area amenities. Each unit is conditioned with 14 SEER Carrier heat pump and air handling units and the corridor is supplied with Carrier rooftop units. Titan Mechanical furnished and installed all CO2 sensors and exhaust for the garage. 15 SEER Heat pump and air handling units condition the amenity areas. All ductwork installed is conformed to the latest edition of the SMACNA duct construction standard and all local codes.
Adam’s Morgan Heights is a 6 story building located at 1777 Columbia Road NW. This building offers 80 luxury style apartments featuring spectacular open layouts and stunning 9 foot ceilings. This contemporary urban style living also offers amenities such as, Lounge with coffee bar, rooftop terrace, fire pit, bike storage and garage parking. Titan installed a mix of First Co. Thru Wall Heat Pumps and Heat Pump Split Systems for the dwellings. Ductless Split Systems condition the amenity areas. Project was Podium deck on lower floors with wood frame vertical. Preconstruction coordination using BIM Modeling followed up with enhanced Commissioning support for close out.
126 apartment wood frame dwellings on a concrete podium. 16 SEER Goodman Split system heat pumps throughout apartments. 16 and 17 SEER heat pump split systems throughout common areas amenities. Mitsubishi ductless split systems. Electric unit heaters, exhaust fans, air devices, copper lineset and condensate drains furnished and installed. Stand-alone controls by Titan. Circulation fans in the garage with CO2 and NO2 in garage with sensors and control panel. Aprilaire fresh air intake ventilators within the apartments. Fresh air intake ducted to screen wall caps in the apartments. Dryer vent risers to the roof. Flue and louver for the generator. Kitchen exhaust duct work to wall cap on exterior wall.
1745 N Street has a total of 68 condominium units located in the Dupont Circle neighborhood on N Street between 17th and 18th Street. It is a development of condominiums that includes two buildings, The Tower and the Historic Building. The Historic is a 29 unit renovation that preserves historic details such as working fireplaces and a grand staircase to meet current codes. The Tower is a new 39 unit 6 story building with an underground garage. The HVAC indoor equipment consists of 68 pancake style units ranging from 1.5 tons to 4 tons with a heat pump located on the roof. Bath exhaust and Dryer vents terminate out of the side of the building to a wall cap. 5 Ductless Split Systems condition the amenity areas and a gas detection system with control panel and sensors was furnished and installed per code requirements.