A mixed-use concrete project with seven stories from developer CAS Riegler consisting of lower floor retail, common areas and 167 Dwelling Units. General contractor is Tishman. The Carrier 16 SEER Split System Heat Pumps with an Energy recovery Unit from AAON. Vertical discharge dryer exhaust with roof mounted utility fans. Ground level will consist of retail concepts in a shared space. Project began in 2018.
Located in DC’s Shaw neighborhood, 2009 8th Street is a boutique luxury apartment community consisting of 132 units and a penthouse level. The eight-story post-tension concrete project includes 16,000 square feet of street-level retail space and one level of below-grade parking. 2009 8th Street will feature amenities such as a green roof, lobby lounge with 2 fireplaces, and a state-of-the-art fitness center. This will be supported by a complete CO/NO system in the garage area. The HVAC will consist of 2 Daikin VRV systems, 1 OA RTU (AAON) unit, 132 Carrier Air Cooled DX Split Systems, (2) 6 stories grease duct risers for future use and 2 B-Vent risers to accommodate the fireplaces. Kitchen, dryer and bathroom exhaust risers tied into dryer exhaust fans on the roof for vertical discharge.
The Hill East Project in Southeast DC, is a 6 story building with podium deck and wood frame. The building consist of 262 apartments, 2 level garage, amenities and future retail. The HVAC system consists of (3) AAON DOAS with Energy Wheels, 262 Carrier/First Co. 15 SEER hot water coil split systems with AC’s roof mounted for the dwellings. Amenities systems are a blend of Carrier and Daikin heat pump systems. Dwelling unit bathroom and kitchen exhaust ventilation is a mix of horizontal exterior discharge and vertical risers connecting to the ERU. This project is very complex in design and construction.